CASE12: HIGH SPEED BROADBAND
New residential and employment development will be expected to include provision for superfast next generation broadband infrastructure.
This should ideally facilitate a fibre to the premise solution, or the equivalent technology, but as a minimum this should be based on a fibre to the cabinet network, or the equivalent technology. This should facilitate the provision of the highest level of broadband speeds to consumers.
Provision should be made with minimal disruption and minimal need for reconstruction, and allow for future growth/improvements in service infrastructure/broadband service. It must be installed on an open access basis.
If superfast broadband is not available at the time of construction, then the necessary infrastructure must be installed to ensure that superfast broadband can be accessed when it is ready.
Where the minimum standards are not met, evidence will be required to demonstrate why this would not be feasible or viable.