Policy information sourced from Enfield’s Edmonton Leeside Area Action Plan
EL25 Design of the Road Network
Where possible and required to support development, there will be improvements to congested junctions and the control of on-street parking. Each development proposal will be assessed on its own merits and characteristics.
The arrangement of streets and places within Meridian Water should be guided by an urban design approach which incorporates sufficient capacity to meet demand and also encourages sustainable travel through a high quality environment. The network design will include a new east-west connection, the Central Spine (see Policy EL6).
This policy should be read in conjunction with Core Strategy policy 24 and DMD policy 47.
For more information please see the Edmonton Leeside Area Action Plan