Policy information sourced from Sevenoaks Core Strategy

LO 6 Development in Edenbridge

In Edenbridge provision will be made for approximately 410 dwellings (2006-2026) on a range of sites suitable for residential use within the urban area, avoiding areas liable to flood.

Land to the west of Edenbridge previously safeguarded to meet long term development needs is re-allocated as Reserve Land to be brought forward for development after 2015 only if required to maintain a five year supply of housing land in the District.

Existing suitable employment sites will be retained with the opportunity for regeneration and redevelopment to better meet the needs of business.

The mix of retail and service uses that contribute to the vitality and viability of the town centre will be maintained.

For more information please see the Core Strategy