Policy information sourced from The London Plan 2021

D2 Infrastructure Requirements for Sustainable Densities

  1. The density of development proposals should:
    • consider, and be linked to, the provision of future planned levels of infrastructure rather than existing levels
    • be proportionate to the site’s connectivity and accessibility by walking, cycling, and public transport to jobs and services (including both PTAL and access to local services).
  2. Where there is currently insufficient capacity of existing infrastructure to support proposed densities (including the impact of cumulative development), boroughs should work with applicants and infrastructure providers to ensure that sufficient capacity will exist at the appropriate time. This may mean that if the development is contingent on the provision of new infrastructure, including public transport services, it will be appropriate that the development is phased accordingly.
  3. When a proposed development is acceptable in terms of use, scale and massing, given the surrounding built form, uses and character, but it exceeds the capacity identified in a site allocation or the site is not allocated, and the borough considers the planned infrastructure capacity will be exceeded, additional infrastructure proportionate to the development should be delivered through the development. This will be identified through an infrastructure assessment during the planning application process, which will have regard to the local infrastructure delivery plan or programme, and the CIL contribution that the development will make. Where additional required infrastructure cannot be delivered, the scale of the development should be reconsidered to reflect the capacity of current or future planned supporting infrastructure.

For more information please see The London Plan 2021