R5 Waste Management

The Council will require applications for larger schemes (as defined in paragraph 5.24) to include details of the measures to be taken in the design, construction, operation, occupation and demolition of existing buildings on site to:

  • Minimise the amount of waste generated;
  • Re-use or re-cycle suitable waste materials generated;
  • Minimise the pollution potential of unavoidable waste;
  • Treat and dispose of the remaining waste in an environmentally acceptable manner; and
  • To maximise utilisation of appropriate secondary construction materials, including recycled aggregates.